During the summer of 2016, extensive renovations were made to the Interactive Language Resource Center. A complete teardown, gutting of the building areas down to the walls and studs, and then a complete rebuild with new LED lighting, changes to the HVAC systems, digital sensors, etc were planned. Below is a pictorial timeline of the progress of the renovations. Enjoy!

Before the Renovations

This is what the The Interactive Language Resource Center looked like prior to May 2016:

Picture 01
Irvin Hall 50

Picture 02
Irvin Hall 50

Picture 03
Irvin Hall 50

Picture 04
Irvin Hall 50

Picture 05
Irvin Hall 60

Picture 06
Irvin Hall 60

Outside Problems

Before the interior of the center could be renovated, the outside courtyard had to be addressed. A french drain system was installed to help circumvent water seepage and leakage into the rooms and building foundation.

Picture 07
Irvin Hall Courtyard

Picture 08
Irvin Hall Courtyard

Picture 09
Irvin Hall Courtyard

Picture 09
Irvin Hall Courtyard

Renovation Day 1

Picture 09
Irvin Hall 60

Picture 10
Irvin Hall 60

Picture 11
Irvin Hall 50

Picture 12
Irvin Hall 50

Picture 13
Irvin Hall 60

Renovation Day 3

Picture 14
Irvin Hall 50

Picture 15
Irvin Hall 50

Picture 16
Irvin Hall 60

Picture 17
Irvin Hall 60

Renovation Day 5

Picture 18
Irvin Hall 50 - A negative pressure area is erected

Picture 19
Irvin Hall 50 - Asbestos found. Gas masks now required

Picture 20
Irvin Hall 50

Picture 21
Irvin Hall 60

Picture 22
Irvin Hall 60

Picture 23
Irvin Hall 60

Renovation Day 7

Picture 24
The blueprints are revealed!!!

Picture 25
Irvin Hall 50 - Asbestos removal containment area

Picture 26
Irvin Hall 50 - Sealed bags of asbestos contaminated material

Renovation Day 10

Picture 27
Irvin Hall 50 - The wall separating the rooms is gone!

Picture 28
Looking into Irvin 60 from 50. The wall is gone!

Picture 29
Irvin Hall 60

Picture 29
Irvin Hall 60 - What is left of the front desk

Picture 28
Looking into Irvin 50 from room 60

Renovation Day 16

Picture 28
Irvin Hall 60 - The foundation of the front desk is gone

Picture 30
Irvin Hall 60

Renovation Day 18

Picture 31
Irvin Hall 50 and 60. The new wall framing begins

Picture 32
Irvin Hall 60 - Framing for the new walls begins

Picture 33
Irvin Hall 60 - Just a little bit of the ramp is left from where the front desk used to be

Renovation Day 21

Picture 34
Irvin Hall 60 - The new walls start to appear

Picture 35
Irvin Hall 60

Picture 35
Irvin Hall 60

Renovation Day 26

Picture 35
Stairwell by the elevator. The center's emergency exit is no more

Picture 36
Irvin Hall 60 - The walls get some sheetrock

Picture 37
Irvin Hall 60

Picture 38
Irvin Hall 60

Renovation Day 33

Picture 39
Irvin Hall 50 - Spackling and Drywall installation begin

Picture 40
Irvin Hall 50

Picture 41
Irvin Hall 60

Picture 42
Irvin Hall 60

Renovation Day 42

Picture 43
Irvin Hall 50 - New HVAC is being installed

Picture 44
Irvin Hall 60 - New HVAC conduit is installed

Picture 45
Irvin Hall 60

Renovation Day 55

Picture 46
Irvin Hall 50 - Ceiling installation begins and whiteboards are hung

Picture 47
Irvin Hall 50 - Foundation is jachkammered to install new electrical and data conduit

Picture 48
Irvin Hall 50

Renovation Day 56

Picture 49
Irvin Hall 60 - New Carpet and flooring begin

Picture 50
Irvin Hall 60

Renovation Day 59

Picture 51
Irvin Hall 60 - New cabinets are installed

Picture 52
Irvin Hall 60

Picture 53
Irvin Hall 60 - Data and electrical installation begin

Picture 54
Irvin Hall 50

Picture 55
Irvin Hall 50 - Cement poured to seal the data and electrical conduit

Renovation Day 62

Picture 56
Irvin Hall 60 - Old furniture moved back in for the moment...

Picture 57
Irvin Hall 60

Picture 58
Irvin Hall 60 - Student station is assembled

Picture 59
Irvin Hall 50

Picture 60
Irvin Hall 50

Renovation Day 70

Picture 61
Irvin Hall 60A - The new storage room

Hiatus - Fall Semester 2016

Renovations stopped at day 72 because the new furniture that the lab was to receive could not be delivered until the first day of classes. Physical Facilities and Miami's heads of renovation decided to reinstall power and data to the old tables and furniture just before the start of fall semester. The lab then spent the semester in transition. We had a new space, but old furniture. The new furniture was rescheduled to be delivered in January 2017 during our Winter Term.

Renovation Days 73-77

Once the fall semester was over and once winter break was enjoyed by all, the renovation restarted and the furniture was finally delivered!

Picture 62
Irvin Hall 60 - Back of the lab is now a mini lounge area

Picture 63
Irvin Hall 60 - View from the back

Picture 62
Irvin Hall 60

Picture 64
Irvin Hall 60 - View from the front

Picture 65
Irvin Hall 50 - View from the back

Picture 66
Irvin Hall 50

Picture 67
Irvin Hall 50 - View from the instructor station in the front

Just one more thing...

Irvin Hall will be going under an electrical substation upgrade in summer 2017. We expect to be without power for 2-3 weeks as the electrical systems are torn out and replaced with more modern equipment. Pictures to come this summer!!!